Day 24

This morning, my lab partner and I started the wet sieving after our advisor helped us with the setup (connecting the tubing, testing to see if the water ran through the sieves properly, etc). We ran into some technical difficulties once we started the sieve shaker (i.e. the base pan was leaking and we couldn't fit some of the sieves into the connector pans) so we had our advisor come up to the roof lab to assist us. We finished the wet sieving for part of the first trial of the 400 gram sand sample in the morning. After lunch, we continued with the sieving and data collection. Before we left, my lab partner and I completed the wet sieving for all three trials of the sand. We plan to finish sieving the clay & silt and gravel tomorrow.